Consumer unit upgrades.

Replacing an old fuse box with a consumer unit that protects the circuits, the cables and the people using them.

  • 4.9from 45 Google reviews
  • NAPITregistered contractor
  • Certifiedand notified to building control
Two newly installed consumer units with dressed conductors and labelled circuits
When a board needs replacing

When a board needs replacing.

  • Rewirable fuses, or a board with no RCD protection at all
  • A plastic board in a flat or a house of multiple occupation
  • Circuits that trip and cannot be isolated separately
  • No spare ways for a new circuit, an extension or an EV charger
  • Scorching, buzzing or a burning smell at the board
  • An EICR that has coded the board C1, C2 or FI
Scope

What the work involves.

  • Testing the existing circuits first, so we know what we are connecting
  • A metal consumer unit to current standards, sized for your circuits
  • RCD or RCBO protection so a fault on one circuit doesn't kill the house
  • Surge protection where appropriate
  • Main protective bonding checked and upgraded if needed
  • Every circuit labelled properly, and a schedule you can actually read
  • Full test, Electrical Installation Certificate and building control notification
How it runs
  1. 01 Check We test the existing installation, because a new board on faulty circuits solves nothing.
  2. 02 Quote Fixed quote covering the board, protection, bonding and any remedial work found.
  3. 03 Swap Usually a day, with power off for part of it. We agree the timing with you first.
  4. 04 Certify Test, label, certify and notify. You keep the paperwork.

“They replied quickly to my enquiry, was available and costed up the project. It was then all completed to a very high standard and I was really happy with the outcome (adding power sockets and lights to my garage). Second time I've used them before and will definitely be using again when required.”

Sam Edmo Garage power & lighting
Questions

Consumer unit upgrades questions.

Not covered here? Call 07732 700630 and ask.

How long is the power off?

For most domestic boards the changeover is done within a day, with the supply off for part of it. We agree the window with you beforehand so you can plan around it.

Why does the quote mention bonding?

A new board is only as safe as the earthing behind it. If the main protective bonding to your gas and water services is missing or undersized, it has to be corrected as part of the work.

My board is fine, but an EICR gave it a C2. What now?

A C2 means potentially dangerous and needs remedial work. Sometimes that is a board replacement, sometimes it is a specific fault on a circuit. We will tell you which, and quote for the work that is actually needed.

Related

You might also need.

Covering High Wycombe, Hazlemere, Marlow, Beaconsfield, Amersham, Gerrards Cross, Chesham, Princes Risborough, Henley-on-Thames, Aylesbury. Areas we cover

What do you need?
Where is the job?
Please enter the postcode of the property.
Type of property
When do you need it?
Tell us a little more
Photos Optional: the board, the fault, the room
Where should we send your quote?
Please tell us your name.
Please add a phone number so we can reach you.
That email address doesn't look right.